
Completed projects
List of completed projects
| No. | project name | the name of the customer | year of completion |
|---|---|---|---|
| 1 | Rehabilitation of the internal streets and the rainwater drainage network for the western sector in the Samah neighborhood on the left side of the city of Mosul | Nineveh Governorate The World Bank | 2021 |
| 2 | Rehabilitation and maintenance of a box arch in West Mosul | UNDP | 2017 |
| 3 | Rehabilitation of the sewage network in Zanjili 5 sites | UNDP | 2018 |
| 4 | Sewer maintenance in East Mosul, Sector 2 | UNDP | 2017 |
| 5 | Rehabilitation and maintenance of the sewage network in West Mosul | ACF | 2018 |
| 6 | Extension of a stream in the Al-Arbajiya neighborhood | Nineveh Sewerage Directorate | 2011 |
| 7 | Extension of a 600/800 mm diameter duct in the Bab al-Beidh area | Nineveh Sewerage Directorate | 2009 |
| 8 | Extending a stream in Al-Hurriya neighborhood | Nineveh Sewerage Directorate | 2012 |
| 9 | Extending a stream in the Palestine neighborhood | Nineveh Sewerage Directorate | 2012 |
| 10 | Project Qualification New left coast water | Nineveh Water Directorate | 2014 |
| 11 | Switching and laying networks on the right side, sector 1 | Nineveh Water Directorate | 2014 |
| 12 | Switching and extending networks on the left coast | Nineveh Water Directorate | 2014 |
| 13 | Rehabilitation of the Dandan water project | Nineveh Water Directorate | 2012 |
| 14 | Rehabilitation of the Tammuz17 and Al-Rifai pumping station | Nineveh Water Directorate | 2012 |
| 15 | Extension and switching networks on the right coast | Nineveh Governorate | 2020 |
| 16 | Extending and switching networks on the left coast | Nineveh Governorate | 2020 |
| 17 | Supplying and delivering dunks, submersibles and other accessories to the Nineveh Water Directorate | UNICEF | 2020 |
| 18 | Project Qualification The new right coast water — the second stage | UNDP | 2019 |
| 19 | Rehabilitation of the water project for the village of Deir Um Tutha / Wana township | ICRC | 2019 |
| 20 | Rehabilitation of the Hegel water station — Salah Al-Din | UNDP | 2019 |
| 21 | Project Qualification old right coast water | ICRC | 2019 |
| 22 | Supplying water pipes with accessories for the village of Deir Um Tutha | ICRC | 2019 |
| 23 | Supplying materials for Nineveh Water Directorate / Qayyarah | DRC | 2019 |
| 24 | Rehabilitation of the Dandan Water Project / Phase II | UNDP | 2018 |
| 25 | Supplying materials for Nineveh Water Directorate / Qayyarah | DRC | 2019 |
| 26 | Rehabilitation of the Dandan water project | UNDP | 2018 |
| 27 | Supplying materials and equipment for the Nineveh Water Directorate | ICRC | 2019 |
| 28 | Rehabilitation of Khawaja Khalil’s water unit | DRC | 2017 |
| 29 | Replacement and extension of water networks in the neighborhood of Al-Masarif / Al-Zohour | Nineveh Water Directorate | 2009 |
| 30 | Replacing and extending water networks in Nineveh Al-Sharqia | Nineveh Water Directorate | 2011 |
| 31 | Replacing and extending water networks in Al-Shuhada / Qayyarah neighborhood | Nineveh Water Directorate | 2010 |
| 32 | Changing and extending water networks in Wadi Hajar | Nineveh Water Directorate | 2010 |
| 33 | Supplying and installing a 100 m³/h pooled water unit in the village of Ahlila | Nineveh Water Directorate | 2009 |
| 34 | Laying of conveyor lines in the village of Keri Sur Makhmour | Nineveh Water Directorate | 2012 |
| 35 | Supplying and installing a 200 m³/h pooled water unit in the village of Al-Damarji | Nineveh Water Directorate | 2014 |
| 36 | Supplying and installing measurement and control devices for alum and sterilization systems for central projects | Nineveh Water Directorate | 2014 |
| 37 | Supplying and installing a 200 m³/h pooled water unit in Zammar | Nineveh Water Directorate | 2014 |
| 38 | Project Qualification New left coast water | Nineveh Water Directorate | 2010 |
| 39 | Replacing and extending water networks in the Debaga district | Nineveh Water Directorate | 2010 |
| 40 | Switching and extending networks in Al-Farij district | Nineveh Water Directorate | 2010 |
| 41 | Supplying chlorine devices for the Nineveh Water Directorate | Un-habitat | 2021 |
| 42 | Replacing and extending water networks in the Malia and Tamim neighborhoods | Nineveh Water Directorate | 2011 |
| 43 | Supplying and installing a 200 m³/h pooled water unit in Hammam Al-Alil village | Nineveh Water Directorate | 2012 |
| 44 | Supplying and installing a 200 m³/h pooled water unit in Ibrahim Al-Khalil / Nimrud village | Nineveh Water Directorate | 2012 |
| 45 | Project Qualification New left coast water | Nineveh Water Directorate | 2012 |
| 46 | Construction of food storage halls in Al Karama Complex/1 | Nineveh Governorate | 2013 |
| 47 | Construction of the office building of the Supreme Authority for Hajj and Umrah with furniture | Nineveh Governorate | 2014 |
| 48 | Rehabilitation of 8 municipal buildings in Hamdaniya district | UNDP | 2018 |
| 49 | Rehabilitation of education in Nineveh Governorate | UNDP | 2017 |
| 50 | Rehabilitation of the Directorate of Sewage in Tel Kaif District | UNDP | 2018 |
| 51 | Construction of the office building of the Supreme Authority for Hajj and Umrah with furniture | Nineveh Governorate | 2019 |
| 52 | Rehabilitation of the headquarters of the International Committee of the Red Cross in the Kafaat neighborhood / Mosul | ICRC | 2020 |
| 53 | Rehabilitation of 3 schools in East Mosul | UNDP | 2018 |
| 54 | Processing and setting up a waste bag factory | Mosul Municipality Directorate | 2020 |
| 55 | Supplying, laying and connecting cable at the University of Mosul, College of Education for Girls | UNDP | 2018 |
| 56 | Rehabilitation of booth No. 14 in Al Hamdania garage | UNDP | 2017 |
| 57 | Renovation of a school in Al-Shura district | Nineveh Education Directorate | 2010 |